Greenville Energy Anaerobic Digestion Plant

Renewable Energy

Projects

Greenville Energy Anaerobic Digestion Plant

Project Description

Supply installation and commissioning of new anaerobic digestion facility for Greenville Energy, County Tyrone. The project included two of 2400m3 digestion tanks complete with adjustable submersible propeller mixers, digester access points, multi-point temperature measurement, insulation and cladding two off 250kWe CHP units (500kWe), Dual membrane gas storage, gas clean up including biological desulphurisation and activated carbon filters, emergency gas flare, waste import facility, digestate drying and separation. All MCC and controls by WIS Group.
WIS Group were responsible for the process design, mechanical and electrical detailed design; instrumentation, control and automation systems design of the digester.
Maintenance and on-going operational support to the operations team continue to be the responsibility of WIS Group from Greenville Energy (Client). Operational support to include calibrations, biological testing and routine mechanical and electrical inspections and maintenance.
CHP servicing provided by CHP service partner.

Greenville Energy Anaerobic Digestion Plant

  • Client: Greenville Energy AD plant
  • Completion Date: September 2012
  • Total Contract Value: £1.7m